Com o BioCrack você pode aumentar a eficiência de sua instalação de biogás, aumentando o gás obtido e reduzindo a necessidade de energia. Isso é o que afirmamos. Mas quais foram as experiências de nossos clientes?

Anexamos para você algumas instalações de referência, quais melhorias nossos clientes obtiveram com o sistema BioCrack. - Fatos que falam por si só, verifique você mesmo.

Dúvidas sobre o BioCrack ou as instalações de referência?

Veja aqui uma lista de referência ou contate a sua pessoa de contato.



BGS
rated
cap.

Residence
Time

Result


kW el

Days

 

Biberach
district

135

approx. 85

Reduction of the quantity of cosubstrate required by 5-10%, significant reduction of gas yield fluctuations; bio-suspension in the overall system less viscous. Problems with mixer and runtimes were reduced

Steinfurt
district

150

n/a

Reduction of the quantity of corn silage required from 7.5 t to 6 t per day
(-20%)

Amberg
district

190

approx. 45

Reduction of the required quantity of cosubstrate by 8% while increasing the amount of grass; energy required for mixing decreased by 10%

Hochsauer
district

220

approx. 100

Use of waste grain no longer necessary = Reduces costs by € 40,000 / year; reduces the cosubstrate quantity required by 10%; decrease the energy requirement for mixing

Hohenlohe
district

240

approx. 120

Reduction of the quantity of cosubstrate required by 10%; bio-suspension flow improved

Cloppenburg
district

500

approx. 120

Reduction of the quantity of cosubstrate by 15%

Kitzingen
district

520

approx. 95

Improvement in system efficiency
of approx. 10%

Greiz
district

528

approx. 45

Reduction of the quantity of grain required from 4t to 2t daily, increasing the efficiency of the overall biogas plant by 8-10%

Dachau
district

600

approx. 160

Reduction of the quantity of cosubstrate by 15%

Pfaffenhofen
district

600

approx. 116

Reduction of the quantity of cosubstrate required; improved flow of the bio-suspension; required mixing power reduced by 50%; floating layers no longer formed

Wolfenbüttel
district

640

approx. 45

16% higher grass yield with an increased amount of grass silage (increase from 7.5% to 20%); reduction of the quantity of cosubstrate required from 41t to 35t per day (-15%); energy required for mixing decreased

Düren
district

720

approx. 70

Reduction of the required quantity of cosubstrate 8%; fermentation substrate is more homogenous and flows better, reducing the energy required for mixing by 50%; pump power consumption reduced

Coburg
district

765

approx. 120

Reduction of the required quantity of cosubstrate by 10%; mixing energy requirement reduced by 30-40% (depending on the use location)

Vogt
district

1.500

approx. 30

The system output was increased from 750 kW to 1,500 kW, while the required quantity of cosubstrate only had to be increased by 75-80%

Göttingen
district

1.200

approx. 80

8% higher gas yield with an improved methane content

Não garantimos as informações. O resultado operacional de uma instalação de biogás depende de diversos fatores que todos podem ter influência. Oscilações e alterações devido a variações das condições de operação são possíveis.